Listen "The Bay Bridge retrofit": 34 years and $8 billion later, is it safer?"
Episode Synopsis
This week on Table Talk we take you on a trip to the Bay Bridge to learn about everything that went into the retrofit after the Loma Prieta earthquake. I talk with CalTrans' Bart Ney about everything that went into the project, with guest appearances from David Lewis of Save the Bay and Former San Francisco Mayor Willie Brown.
More episodes of the podcast Table Talk with Senator Steve Glazer
Fusion Ignition: Limitless Clean Energy?
01/11/2024
Agave: The Spirit of California
24/10/2024
Touchdown: Girls Flag Football!
10/10/2024
Tackling Youth Football Safety
30/09/2024
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.