Listen "91. After the Fires, Will Prefab Sprout?"
Episode Synopsis
Amidst the unprecedented destruction wrought by the multiple fires that swept across Southern California in January 2025, there are opportunities, and causes for optimism that we can build back, better than before. Among these is the prospective role of prefabricated construction,
which can be 30 to 50 percent faster than traditional methods. Steve Glenn, CEO of Plant Prefab, shares his thoughts on the role prefab can play in reconstruction.
--
Intro/Outro: “Elevator,” by The Cooper Vane
--
Discussed:
Bloomberg CityLab: Los Angeles Fire Victims Turn to Prefab Homes for Quick Builds
Regulations:
California Coastal Commission
CEQA
CALGreen
Title 24
HUD Code (Manufactured Homes)
Wildland Urban Interface (WUI) Zones
Woolsey fire, 2018
Architecturally significant buildings (at least 32) lost in the fires
which can be 30 to 50 percent faster than traditional methods. Steve Glenn, CEO of Plant Prefab, shares his thoughts on the role prefab can play in reconstruction.
--
Intro/Outro: “Elevator,” by The Cooper Vane
--
Discussed:
Bloomberg CityLab: Los Angeles Fire Victims Turn to Prefab Homes for Quick Builds
Regulations:
California Coastal Commission
CEQA
CALGreen
Title 24
HUD Code (Manufactured Homes)
Wildland Urban Interface (WUI) Zones
Woolsey fire, 2018
Architecturally significant buildings (at least 32) lost in the fires
More episodes of the podcast Unfrozen
108. NORTH
16/11/2025
107. Spectropolis
18/10/2025
106. Insurrection
15/10/2025
105. The House of Dr. Koolhaas
04/10/2025
104. Make Gaza GREAT Again
10/09/2025
103. Going for Zero
17/08/2025
102. Revitalize | Resettle
03/08/2025
100. Dancing About Architecture
20/05/2025
99. The Venetian Scheme
10/05/2025
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.