Listen "Nuclear Power Plant Decommissioning"
Episode Synopsis
Nuclear power plant decommissioning in the U.S. is a complex process overseen by the Nuclear Regulatory Commission (NRC). The process involves safely removing radioactive materials, dismantling structures, and ensuring the site is environmentally sound before license termination. Two main decommissioning options exist, SAFSTOR (safe storage) and DECON (immediate decontamination), with funding requirements determined by the NRC based on technical studies and cost estimations. Multiple agencies participate in the regulatory oversight to protect public health and safety. Numerous reactors have completed or are currently undergoing this process.
More episodes of the podcast Energy Risk Engineering
LNG & LPG Emergency Response SOP
28/10/2025
Large Battery System Losses 2020 - 2025
19/10/2025
Hydrogen & BESS Projects: How Compliance Software Streamlines Design, Operations & Insurability
29/08/2025
IR and the new NFPA 70B requirements
28/08/2025
9540 and 9540A Overview
25/06/2025
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.