Listen "After the Storm (Part 2)"
Episode Synopsis
Hurricane Irene raised concerns about the Gilboa Dam and the ability of water infrastructure to manage the massive amounts of water produced by large storms. How the DEP is preparing for the impacts of climate change in our future. This episode features Adam Bosch, former DEP Director of Public Affairs for the NYC water supply. (Episode recorded in 2021)
If you're taking this tour in person, please play this episode at Devasego Park in Prattsville, on the banks of Schoharie Creek. Accessibility: the parking lot has a hard-packed surface which is accessible, and the park is mowed grass which is less so. Please visit walkingthewatershed.com/podcasttour/listen.html to download a printed map, transcripts, accessibility info, and other important information.
Photo: NYC Department of Environmental Protection
If you're taking this tour in person, please play this episode at Devasego Park in Prattsville, on the banks of Schoharie Creek. Accessibility: the parking lot has a hard-packed surface which is accessible, and the park is mowed grass which is less so. Please visit walkingthewatershed.com/podcasttour/listen.html to download a printed map, transcripts, accessibility info, and other important information.
Photo: NYC Department of Environmental Protection
More episodes of the podcast Views from the Watershed
Start Here
19/12/2024
Introduction: Connected By Water
19/12/2024
A Difficult History
19/12/2024
A Miracle of Modern Engineering
19/12/2024
A Seat at the Table
19/12/2024
Trout and Tourism
19/12/2024
Tough Choices
19/12/2024
Un-Muddying the Waters
19/12/2024
Hard Work
19/12/2024
Upgrading Infrastructure
19/12/2024
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.