Short, sweet and behind schedule; UMass IPM Fruit Loop Vol. 29 Episode 12

27/07/2021 13 min Temporada 29 Episodio 12

Listen "Short, sweet and behind schedule; UMass IPM Fruit Loop Vol. 29 Episode 12"

Episode Synopsis

Oh, hey there, long time no... erm... listen.
This episode is heavy on the way Jon sees things with a healthy serving of entomology. Tune in and harken back to June 25th or so.

Music credits:
Intro/Outro: Strobotone - San Fran Interlude (Edit) 
Strobotone is licensed under a Attribution-NonCommercial-NoDerivatives 2.0 Germany License.
Entomology Psychology: Checkie Brown - Wirklich Wichtig (ID 211)Wirklich Wichtig (ID 211) by Checkie Brown is licensed under a Attribution-NonCommercial-NoDerivatives 4.0 International License.
Diseases intro:Hippie Bulle - StonedFunghi(ID213)by CheckieBrown Attribution-NonCommercial-NoDerivatives 4.0 International License.

More episodes of the podcast UMass IPM Fruit Loop