Listen "189 - STS-92 - Over and Under (Z1 and PMA-3)"
Episode Synopsis
After a long wait for the crew (and audience!) STS-92 is finally here. We'll be delivering the heart of the ISS external structure, the Z1 truss, as well as a new docking port, PMA-3. Along the way we'll learn a bit about the folks on the ground who make this all possible, walk through four complicated EVAs, see something no one's seen since 1967, and put our plumber's hats on. Show notes: https://thespaceabove.us/episodes/ep189_sts-92 The Space Above Us website: https://thespaceabove.us Support the show: https://thespaceabove.us/donate TSAU Patreon: https://patreon.com/thespaceabove.us
More episodes of the podcast The Space Above Us
192 - Expedition 1 - ISS, Meet IT
03/06/2025
185 - STS-99 - Here Comes The Boom (SRTM)
09/02/2024
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.