Andy Bedford of Encyclis on the development of the UK's first full scale carbon capture project for energy-from-waste at the Protos plant

15/12/2025 25 min Temporada 5 Episodio 2
Andy Bedford of Encyclis on the development of the UK's first full scale carbon capture project for energy-from-waste at the Protos plant

Listen "Andy Bedford of Encyclis on the development of the UK's first full scale carbon capture project for energy-from-waste at the Protos plant"

Episode Synopsis

For the second episode of the fifth series, the Burning Issue talks to Andy Bedford, low carbon development director at Encyclis, about the development of the UK's first full scale carbon capture facility for the energy-from-waste (EfW) sector. This episode discusses: Andy's role in leading the Protos carbon capture project and the story behind the developmentThe challenges faced and how they were overcomeHow carbon capture works alongside an EfW facilityWhat does Protos mean for the potential future roll-out of carbon capture in the Encyclis fleet and the wider UK EfW sectorScepticism about achieving commercial-scale carbon capture deployment in the UK EfW sector

Hosted on Acast. See acast.com/privacy for more information.

More episodes of the podcast The Burning Issue