Five CO2 Heat Pumps from Clade Replace Gas Boilers at Leisure Center in Northern England

12/11/2025 3 min
Five CO2 Heat Pumps from Clade Replace Gas Boilers at Leisure Center in Northern England

Listen "Five CO2 Heat Pumps from Clade Replace Gas Boilers at Leisure Center in Northern England"

Episode Synopsis

A leisure center in northern England has replaced its gas boilers and combined heat and power (CHP) plant with five CO2 (R744) heat pumps supplied by U.K. HVAC&R manufacturer Clade Engineering.The installation at the Orford Jubilee Neighbourhood Hub in Warrington comprises five Maple SN/300 heat pumps, providing a total heating output of 1.5MW (426.5TR).Read the full story on NaturalRefrigerants.com.

More episodes of the podcast The ATMOsphere Podcast Network