Listen "Cost of Ring Road No. 3 section up by over VND1.6 trillion"
Episode Synopsis
The estimated cost of the Tan Van-Nhon Trach section of the Ring Road No. 3 project, which will connect HCMC, Binh Duong, Dong Nai and Long An, has risen by over VND1.6 trillion after six years of delays.
More episodes of the podcast Saigon Times Podcasts
Work begins on Metro Line 2 in HCMC
25/02/2024
Brazil halts importing tilapia from Vietnam
22/02/2024
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.