Episode Synopsis "Preparing for the TBM"
As the Design-Builder for Virginia's largest construction project awaits Notice to Proceed, early work is underway on the Hampton Roads Bridge-Tunnel Expansion Project. The South Island is percolating with activity to prepare the island for the massive Tunnel Boring Machine (TBM) which will bore twin tunnels parallel to the existing tunnels. In the latest installment of HRBT Tunnel Talk, Paula Miller talks with Project Director Jim Utterback about the significant effort it takes to obtain such a large permit, and she learns about 8 months of preliminary island work from Xavier Billy, the Construction Manager for the Tunnel Approach Structures. Please subscribe to our podcast!
Listen "Preparing for the TBM"
More episodes of the podcast HRBT Tunnel Talk
- The new HRBT Expansion Project Welcome Center
- Hampton Roads Express Lanes Network
- Uncovering Archeological Discoveries on the HRBT Expansion Project
- Celebrating Historic Milestones - TBM breakthrough and what's coming up next for Mary
- Women in Maritime Construction
- Mary is So Boring! Learn about progress on the new tunnel.
- Coordinating Construction in Hampton
- Environmentally Speaking
- The Role of the Slurry Treatment Plant PART 2
- The Role of the Slurry Treatment Plant - Reuse, Recycle, Reduce
- Kids Ask 'Boring' Questions
- Regionalism and Transportation Funding
- Reassembling Mary the TBM
- What to Expect this Summer: Lane Closures Ahead
- Casting A New Tunnel
- HRBT Tunnel Talk Young Professionals
- DBE/SWaM Resources
- HRBT Tunnel Talk Safety
- HRBT Tunnel Talk Summer Construction
- HRBT Tunnel Talk Marine Construction
- HRBT Tunnel Talk North Island Reclamation
- Naming the TBM (Tunnel Boring Machine) Contest
- Preparing for the TBM
- Preparing to Build
- HRBT Expansion Project
- DBE/SWaM Opportunities for HRBT Tunnel Expansion Project
- Unlock the Gridlock