Latest episodes of the podcast ENR Critical Path Podcast
Mostrando página 4 de 7
A Special Roving Podcast from AOE 2023
27/06/2023
Kumar Parakala Talks Digital Innovation
23/05/2023
Passing the Education Design Baton at QKA
09/05/2023
Rene Morkos on “construction optioneering”
21/04/2023
Arup’s Experts Talk EV Transition
06/03/2023
Tina Millan on the evolution of aviation
26/01/2023
2022 FutureTech Conference
08/09/2022
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.