Listen "AvTalk Episode 212: A non-standard manufacturing process"
Episode Synopsis
On this episode of AvTalk, Boeing stops deliveries of most 737 MAX due to a “non-standard manufacturing process” on the fuselage-vertical fin joint. Sudanese airspace is closed after renewed fighting. And some former Polar Air Cargo executives and suppliers could be facing lengthy prison sentences. Sudan airspace closed, aircraft destroyed Multiple civilian aircraft were destroyed […]
The post AvTalk Episode 212: A non-standard manufacturing process appeared first on Flightradar24 Blog.
The post AvTalk Episode 212: A non-standard manufacturing process appeared first on Flightradar24 Blog.
More episodes of the podcast AvTalk - Aviation Podcast
AvTalk Episode 346: The A340-600 episode
21/11/2025
AvTalk Episode 345: Reasonable people
14/11/2025
AvTalk Episode 344: UPS flight 2976
07/11/2025
AvTalk Episode 343: It’s a retention issue
31/10/2025
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.