Fore-Sites or Hind-Sites?

17/08/2022 24 min
Fore-Sites or Hind-Sites?

Listen "Fore-Sites or Hind-Sites?"

Episode Synopsis

Sites Reservoir Project has been on the drawing board since the 1950’s.  Over the last decade or so it has gone through numerous design changes, partnerships, as well as cost and benefit analysis.  Fritz Durst from Reclamation District 108 serves as Chairman of the Sites Project Authority.  Fritz shares with us how the project got to where it is today, where it is in the planning process, and what, if anything, is next.Send us a textWe Grow California Podcast is paid for by the Exchange Contractors Federal PAC and Exchange Contractors State PAC and is not authorized by any candidate or candidate committee.

More episodes of the podcast We Grow California