Planning an infrastructure future without flooded freeways, basements in metro Detroit

28/12/2020 26 min Episodio 95
Planning an infrastructure future without flooded freeways, basements in metro Detroit

Listen "Planning an infrastructure future without flooded freeways, basements in metro Detroit"

Episode Synopsis

On this final episode of Detroit Rising for 2020, Crain's Senior Editor Chad Livengood talks with Suzanne Coffey, chief planning officer for the Great Lakes Water Authority, about GLWA's new 40-year master plan. The blueprint for underwater infrastructure includes plans for alleviating frequent flooding of metro Detroit's freeways.

More episodes of the podcast Small Business Spotlight