Listen "11/6/25 SCCRTC P4 - Adoption of the Consolidated Grants Program"
Episode Synopsis
Adoption of the Consolidated Grants Program and Regional Transportation Improvement ProgramFollowing consideration of public and advisory committee input, the Commission adopted the 2025 Consolidated Grants Program and the 2026 Regional Transportation Improvement Program (RTIP), approving road, bike, pedestrian and transit projects to receive the region’s anticipated formula share of certain state and federal funds totaling approximately $15 million. RTC staff used metrics to evaluate the projects that align with regional, state, and federal goals in the areas of access, safety, infrastructure condition, system performance and reliability, sustainability, resiliency, health, equity, and deliverability.Projects that received funding include:• Coastal Rail Trail Segments 8-9 and 10-11• Multimodal Projects on Soquel Drive, Freedom Blvd, and Bay Ave in Capitola• Santa Cruz METRO 90X express bus service between Santa Cruz and Watsonville using the new redbus-only shoulders on Highway 1• Pavement maintenance, roadway rehabilitation and traffic calming projects on local roadsthroughout the county• New and upgraded bike/pedestrian facilities projects in Capitola, Scotts Valley, and WatsonvilleRTC Documents are here:https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/Original video is here:https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY
More episodes of the podcast Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks
11/6/25 SCCRTC P5 - Measure D Five-Year Programs of Projects for Regional Projects and Lift Line
13/11/2025
11/6/25 SCCRTC P3 - Caltrans Report
13/11/2025
11/6/25 SCCRTC P2 - Director's Report
13/11/2025
11/6/25 SCCRTC P1 - Commissioner's Reports
13/11/2025
10/2/25 SCCRTC P7 - Q&A part 2
08/10/2025
10/2/25 SCCRTC P6 - Q&A part 1
08/10/2025
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.