Listen "The Work Breakdown Structure (WBS)"
Episode Synopsis
A work breakdown structure (WBS) in project management and systems engineering, is a tool used to define and group a project’s discrete work packages in a way that helps organize and define the total work...
The post The Work Breakdown Structure (WBS) appeared first on PM for the Masses.
The post The Work Breakdown Structure (WBS) appeared first on PM for the Masses.
More episodes of the podcast PM for the Masses
Why OKRs Fail (and How to Fix Them)
14/07/2025
Waterfall, Agile, AI
17/06/2025
Project Managing Anything with Kerry Hoffman
16/09/2024
The Chief Project Officer
14/05/2024
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.