Listen "S2E1: Kanban can not deliver within 2 weeks so scrum is better"
Episode Synopsis
In this episode, Soma and Orod discuss about another Kanban Myth, whether Kanban can deliver results within a two-week timeframe. Drawing from their own experiences, they explore how Kanban operates with SLAs and compare this to the two-week time-boxed events in Scrum.4o
More episodes of the podcast Kanban Lab
S2 E37 Kanban does (not) support change
22/04/2025
S2E31 Kanban does (not) have feedback loop
25/11/2024
S2E9 - Kanban has (no) metric
21/10/2024
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.