S2E1: Kanban can not deliver within 2 weeks so scrum is better

03/07/2024 14 min Temporada 2 Episodio 1

Listen "S2E1: Kanban can not deliver within 2 weeks so scrum is better"

Episode Synopsis

In this episode, Soma and Orod discuss about another Kanban Myth, whether Kanban can deliver results within a two-week timeframe. Drawing from their own experiences, they explore how Kanban operates with SLAs and compare this to the two-week time-boxed events in Scrum.4o