Listen "Episode 34. Assembly Jig Issues, Optimize for learning"
Episode Synopsis
In this episode Devin and Uriel talk about some of the improvments they made over the past week and the thinking behind each.
8 Lean wastes - Over production, Over Processing, Excess inventory, Defects, Transportation, Wasted motion, Waiting, Wasted human potential
Some of the improvements include:
- Assembly jig issues and modifications
- Job tracking changes to address missed shipments
- Sewing Jig feedback
- Finished our new tool tag implementation
- New drop off routine for automated part unloading
- Finished trunnion table machining
- Austere bought a Freddy!
Please follow us on Instagram and share your improvements and tag us.www.instagram.com/incrementalci In this podcast we discuss concepts from Lean Manufacturing, the Toyota Production System, and general business management to improve our businesses. Thanks for listening! Please drop us a note with any and all feedback!
If you have parts you need machined, reach out to [email protected] and follow on Instagram www.instagram.com/lichen_mfg If you need CNCed Buckles, check out www.austeremfg.com and follow at on Instagram www.instagram.com/austere_manufacturing
More episodes of the podcast Incremental: The Continuous Improvement Podcast
Episode 185. Changing Pace
31/12/2025
Episode 183. Is Quality Free
20/11/2025
Episode 182. What even is an SOP anyway?
12/11/2025
Episode 178. The slow yes and the fast no
15/10/2025
Episode 177 Muda Killer
08/10/2025
Episode 176. Tricks of the Trade
01/10/2025
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.