Listen "Integrity Operating Windows 101"
Episode Synopsis
This document outlines a comprehensive program for implementing an Integrity Operating Window (IOW) at a refinery, focusing on ensuring safe and reliable operations. The IOW program involves establishing operating limits for critical parameters, monitoring these parameters, and developing procedures for responding to exceedances. The program is divided into four phases: Foundation, Development & Pilot, Full Implementation, and Optimization & Sustainability. Each phase includes specific actions, such as identifying critical equipment, defining operating limits, establishing notification levels, developing data collection systems, and providing training for operators and engineers. The document also highlights considerations for Southern climates, emphasizing temperature management and corrosion monitoring. The success of the IOW program depends on key elements such as management commitment, clear roles and responsibilities, effective communication protocols, robust data management, and regular training and updates.
More episodes of the podcast Energy Risk Engineering
LNG & LPG Emergency Response SOP
28/10/2025
Large Battery System Losses 2020 - 2025
19/10/2025
Hydrogen & BESS Projects: How Compliance Software Streamlines Design, Operations & Insurability
29/08/2025
IR and the new NFPA 70B requirements
28/08/2025
9540 and 9540A Overview
25/06/2025
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.