40 ft / 12m Tower Project - Guys and Rotator fitting

15/10/2024 41 min
40 ft / 12m Tower Project - Guys and Rotator fitting

Listen "40 ft / 12m Tower Project - Guys and Rotator fitting"

Episode Synopsis

I drilled out the scaffold guys for the eye bolts, fitted the rotator, fitted the falling derrick system and the first scaffold tube to deliver the first piece of the tower....https://www.youtube.com/watch?v=O_pQN0pMvmA