Skip to content
zarza zarza
Advertisement

The Draw Schedule Problem in Modular Finance

27/01/2026 4 min Temporada 1 Episodio 19
The Draw Schedule Problem in Modular Finance

Listen "The Draw Schedule Problem in Modular Finance"

Episode Synopsis


Why do draw schedules create problems in modular construction financing?Traditional construction draws are tied to on-site progress. In modular, most of the work happens at the factory before anything is visible on site. That mismatch creates real financing friction.Topics covered:The timing gap between factory production and site progressWhy lenders struggle with paying for off-site workHow to structure draws that match modular cash flowFactory inspection and verification for lender comfortFor developers and lenders negotiating modular construction financing.Built Different is produced by Spring Street Management Group. New episodes drop weekdays at 6 AM Pacific.]]>

More episodes of the podcast Built Different

ZARZA Studio — Your station on air today: library, music clock, schedule, studio and reports, from the browser.

Meet ZARZA Studio
on air now stations in the catalogue 1,829,025 podcasts countries