Listen "HCMC needs additional VND30 trillion to complete Beltway 2"
Episode Synopsis
The HCMC Department of Transport has said that over VND30 trillion is needed for an 11.3-kilometer section of Beltway No. 2 that has not yet been built.
More episodes of the podcast Saigon Times Podcasts
Work begins on Metro Line 2 in HCMC
25/02/2024
Brazil halts importing tilapia from Vietnam
22/02/2024
ZARZA We are Zarza, the prestigious firm behind major projects in information technology.